7 Items Overlooked When Preparing Hospital Equipment Technical Specifications
12 September 2026
A significant share of the problems in hospital and laboratory equipment purchases arise not at the procurement stage but at the specification stage. An incompletely defined technical specification allows every bidder to answer "compliant" — yet the products that arrive on site turn out to be completely different from one another.
The result is usually the same: incompatibilities discovered during installation, a shorter service life than expected and equipment that needs to be replaced within a short time.
In this article, we look at the seven items most often overlooked in healthcare facility equipment specifications and how they should be defined.
1. Material Grade Is Specified, Thickness Is Not
The phrase "AISI 304 stainless steel" is almost standard in specifications. Sheet thickness, however, is often left out.
Two worktops made of the same grade but different thicknesses look identical at first glance. The difference appears once intensive use begins: thin-sheet worktops sag over time and doors start to bend.
Correct definition: Material grade, sheet thickness and, where necessary, reinforcement structure should be specified separately. If the load the surface will carry is known, it should also be stated.
2. Surface Finish and Weld Quality Are Not Defined
Hygiene performance depends not only on the material but also on how the surface is finished. Rough surfaces and poorly ground weld seams make cleaning harder and become starting points for corrosion.
Correct definition: The surface finish, ground and passivated weld areas, and the absence of sharp corners should be clearly stated in the specification.
3. Cleaning and Disinfection Conditions Are Not Shared
The type of disinfectant used in the facility directly affects the material selection of the equipment. Using standard-grade material in an area with intensive chlorine-based disinfection significantly shortens equipment life.
Correct definition: The specification should state which disinfectant groups the equipment will be exposed to and how often. This information allows the supplier to recommend the right material grade.
4. Installation Area Dimensions Are Not Verified On Site
Especially in renovation projects, the dimensions in the drawings may not match the actual dimensions on site. Uneven walls, the position of service outlets, door clearances and ceiling heights cause problems during installation.
Correct definition: The specification should require on-site measurement and coordination of service connection points. For modular systems, flexibility to adapt to site conditions should be requested.
You can explore our solutions that adapt to site conditions in our Modular Cabinet Systems category.
5. Ergonomic Criteria Are Skipped
When writing the technical features of equipment, the working conditions of the staff who will use it eight hours a day are often overlooked.
Worktop height, drawer reach distance, door opening direction, legroom and the possibility of seated work — all of these affect efficiency and staff health. A sterilization packaging table at the wrong height leads to musculoskeletal complaints in the long term.
Correct definition: The working height range, adjustability requirements and working position (standing / seated) should be included in the specification.
6. The Service Life of Moving Parts Is Not Defined
While the body of a cabinet or worktop may last ten years, its hinges and drawer runners can fail within two. In heavily used areas, moving parts wear out much faster than the body.
When these parts are not defined in the specification, the supplier uses the most economical option and failures begin soon after.
Correct definition: Drawer runner load capacity, opening-closing cycle count, soft-close functionality, hinge quality and locking system should be defined as separate items.
7. After-Sales and Spare Parts Terms Are Not Written
The availability of spare parts needed throughout the life of the equipment should be part of the purchasing decision. Replacing an entire unit because of a single drawer runner from a discontinued model is a common situation in healthcare facilities.
Correct definition: Warranty period, spare parts supply commitment, service response time and post-installation training should be included in the specification.
Additional Items for Special Areas
In addition to the standard items, some units have their own specific requirements:
- Nuclear medicine and radioisotope areas: Lead-equivalent thickness, continuity of shielding, shielding integrity at door and cover transitions, locked access control.
- Central sterilization units: Layout suited to dirty–clean zone separation, high corrosion resistance in the washing area, worktop sequence matching the workflow.
- Imaging and interventional procedure rooms: Magnetic field compatibility, quick access to consumables, maximum storage in limited space.
- Dental clinics: Integration of the unit with furniture, alignment of service outlets, ergonomics of the clinician's working area.
You can explore our solutions for these areas in our Nuclear Medicine & Lead-Lined Laboratory Furniture and Paloma Dental categories.
The Value of Talking to Suppliers When Preparing Specifications
The technical specification is prepared at the very beginning of the purchasing process — the stage when the facility's needs are least clear. For this reason, holding technical discussions with manufacturers before writing the specification prevents most of the incompatibilities that would otherwise emerge later.
Such a discussion does not mean choosing a supplier; it means seeing what is possible on site, which solutions are applied and which details are critical.
The Right Specification, the Right Equipment
A well-prepared technical specification shortens the purchasing process, makes bids comparable and, most importantly, ensures that the product delivered to site meets expectations.
At Paloma, we work with technical teams from the project design stage onward and define solutions suited to the conditions of each area together.